Critical Progress: Septic Tank Installation at Our Model Home

Exciting progress on our model home! Today, we're installing the septic tank, a crucial step in the construction process. This system ensures that our model will have a reliable and efficient waste management solution.

Here’s what’s happening:

  1. Excavation: We started by excavating the area to create space for the tank and the drain field.

  2. Tank Placement: The septic tank is carefully placed in the excavated area, ensuring it's level and secure.

  3. Connecting Pipes: Pipes are installed to connect the home’s plumbing to the tank, and from the tank to the drain field.

  4. Backfilling: After all connections are secure, the excavated area is backfilled and graded to ensure proper drainage.